Second Floor & Roof Plans

There are really very few changes here from the soft drawing layout. Joe said that when they were laying things out in CAD he noticed that we had enough room to make the girls bathroom's independent, and they could each have their own tub/shower. After talking it through, Jen, Joe and I agreed this was a favorable change. Along with extending the lavatory/area in both bathrooms, everything else is basically the same. The roof continues to to be mostly speculative with the only thing set in stone are the location of a future bathroom, and the ideal places for the green roof and exit onto the roof from the stairs below. More to come here as we begin to understand our cost base for things in the home, and where we are going to have to cut things off to stay on our budget.